Ready Mixed Concrete Truck Drivers: WorkRelated Hazards ...
At central mixing plants, also known as "wet" plants, water is measured and added to the ready mixed concrete at the plant rather than in the field. This procedure was introduced to the industry for quality control and requires drivers to drop their loads within 90 minutes of leaving the plant.